Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H
- Erecting and dismantling scaffolding.
- Erection of steel structure.
- Install electrostatic precipitator.
- Install and align the fan.
- Install and align the pump, etc
Other Projects
Maintenance , overhaul turbine, generator and auxiliary equipment Unit 2
Online leak sealing for 2" pipeline welds
Installing pipes, equipment to convert raw CO2 lines
Overhaul for Fuel Supply Pump System Flowserve PU201-203
Dynamic balancing for pump impeller 045-P-101A/B/C/D